TOP PAGE > News > We opened our New Technical Center

We opened our New Technical Center

 We opened our new technical center at December 11. There are coffee shop where you can drink and watch our detailers do work from the wide glass divider. In the coating area, we can control temperature and humidity so we can work on any outside conditions. We also prepare LED spotlight and LED Beam lump so we can see anything on the surface to achieve absolute mirror finish.

 At this technical center, we can also accept training, demonstration of our products, so if you are interested in, please feel free to email us.

201419_1 201419_2 201419_3 

201419_4 201419_5 201419_6

Copyright(C) Crystal Process Co .,Ltd All Rights Reserved.